Installation
Stage
1
The site is prepared by excavating the existing area to minimum of 10 cm
and compacting as necessary with hardcore.
Stage 2
The perimeter area is shuttered and levels are set.

Stage 3
The concrete
is poured to minimum thickness of 10 cm for driveways and 7.5 cm for patios
& pathways before being leveled& bull floated to ensure an even
surface.

Stage 4
The chosen
colour of hardener is applied.

Stage 5
After being
imprinted with your chosen pattern a release agent is applied to aid separation
of imprint mats from the concrete.

Stage 6
Finally the
release agent is washed off and the surface of the concrete is washed
with acid.

Stage 7
The completed driveway is ready for use.
|